Projects

Projects from the supplied portfolio.

BANGUNAN TAMBAHAN MAKTAB PEGAWAI POLIS
Project · 2 photographs

BANGUNAN TAMBAHAN MAKTAB PEGAWAI POLIS

View photographs from this project in the gallery.

CADANGAN MEMBINA BANGUNAN AKADEMIK DI INSTITUT LATIHAN KESIHATAN
Project · 5 photographs

CADANGAN MEMBINA BANGUNAN AKADEMIK DI INSTITUT LATIHAN KESIHATAN

View photographs from this project in the gallery.

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN MAKTAB PEGAWAI POLIS DIRAJA MALAYSIA
Project · 4 photographs

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN MAKTAB PEGAWAI POLIS DIRAJA MALAYSIA

View photographs from this project in the gallery.

CADANGAN MEMBINA DAN MENYIAPKAN SK TAMAN TUN TEJA
Project · 3 photographs

CADANGAN MEMBINA DAN MENYIAPKAN SK TAMAN TUN TEJA

View photographs from this project in the gallery.

INDUSTRIALISED BUILDING SYSTEM (IBS)
Project · 3 photographs

INDUSTRIALISED BUILDING SYSTEM (IBS)

View photographs from this project in the gallery.

PEJABAT POLIS KONTINJEN
Project · 2 photographs

PEJABAT POLIS KONTINJEN

View photographs from this project in the gallery.

PEMBINAAN BANGUNAN TAMBAHAN IBU PEJABAT POLIS KONTINJEN
Project · 6 photographs

PEMBINAAN BANGUNAN TAMBAHAN IBU PEJABAT POLIS KONTINJEN

View photographs from this project in the gallery.

PEMBINAAN BANGUNAN TAMBAHAN PERPUSTAKAAN NEGARA MALAYSIA
Project · 6 photographs

PEMBINAAN BANGUNAN TAMBAHAN PERPUSTAKAAN NEGARA MALAYSIA

View photographs from this project in the gallery.

PEMBINAAN PUSAT PERMATA AUTISME NEGARA
Project · 2 photographs

PEMBINAAN PUSAT PERMATA AUTISME NEGARA

View photographs from this project in the gallery.

PEMBINAAN PUSAT PERMATA AUTISME NEGARA (REKA DAN BINA)
Project · 4 photographs

PEMBINAAN PUSAT PERMATA AUTISME NEGARA (REKA DAN BINA)

View photographs from this project in the gallery.

PROJEK PERUMAHAN SWASTA TERBENGKALAI DI SEMENANJUNG MALAYSIA
Project · 6 photographs

PROJEK PERUMAHAN SWASTA TERBENGKALAI DI SEMENANJUNG MALAYSIA

View photographs from this project in the gallery.

PUSAT LATIHAN PERTAHANAN AWAM KLUANG, JOHOR (FASA 2)
Project · 6 photographs

PUSAT LATIHAN PERTAHANAN AWAM KLUANG, JOHOR (FASA 2)

View photographs from this project in the gallery.

STADIUM JALAN RAJA MUDA ABDUL AZIZ
Project · 5 photographs

STADIUM JALAN RAJA MUDA ABDUL AZIZ

View photographs from this project in the gallery.

Portfolio records

Project details & contract values

Award dates, clients, locations and contract values are shown as provided in the supplied project list.

Current projects

Projects listed as current

2 projects

The CV lists these as current projects. Their target completion dates are included below as stated in the document.

Job no.ClientProjectContract valueStartTarget completion
QSE/28JKR Kluang JohorWorks at the Ward Furniture Room, Hospital Enche' Hajjah Khalsom, Kluang, Johor.RM12,800,000.0024 Aug 202330 Aug 2026
QSE/29MRCBALAM (KSSA) project: stadium for up to 45,000 spectators, field, training facilities, walkways, parking, landscaped park, flood mitigation, public infrastructure, roads, drainage, and demolition of the old stadium and associated buildings.RM4,600,000.0013 Jan 202613 Jun 2026

Completed projects

List of completed projects

23 projects
Award date / job no.ClientProjectContract value
01 Aug 1995En. Khairul AnuarConstruction and completion of a two-storey house at No. 2094, Kajang, Selangor.RM252,000.00
02 Feb 1996En. Husin SenikConstruction and completion of a two-storey house at Lot 3266, Jalan Seroja Paya Jaras, Sungai Buloh, Selangor.RM288,000.00
02 Sep 1997SMART Driving Academy Sdn. Bhd.Construction and completion of the SMART Driving Academy institute at Lots 2677, 2678 and 2689, Olak Lempit, Kuala Langat, Selangor.RM2,871,161.50
05 Jan 1998Zetcom Sdn. Bhd.Land clearing at Lot 2676, Mukim Tanjung 12, Olak Lempit, Kuala Langat, Selangor.RM12,750.00
01 Jul 1998Pn. Norashidah SallehConstruction and completion of a two-storey house at Lot 1455, Jalan Gajah 21, Kampung Kubu Gajah, Sungai Buloh, Selangor.RM210,000.00
24 May 1999Mat Tarmizi RaufHouse renovation and completion at No. 10, Jalan Desa 8/4, Rawang Country Home, Rawang, Selangor.RM32,000.00
29 May 2001JKR MelakaConstruction of a four-storey additional building and associated works at Sekolah Kebangsaan Seri Lanang, Jasin, Melaka.RM1,372,860.00
04 Jul 2001Universiti Putra Malaysia (UPM)Construction and completion of the Student Centre Complex at UPM, Serdang, Selangor.RM1,999,000.20
18 Apr 2005JKR MalaysiaInspection, repair and replacement of bridges on federal roads in Selangor, including Sungai Chui/Gombak and Sungai Rawang/Gombak areas.RM9,803,699.78
12 Apr 2006SYABASNon-Revenue Water Reduction Programme, Package 1B: replacement of old water pipes in Petaling, including Jalan Gasing, Petaling Jaya and Taman OUG, Batu 14, Puchong.RM16,810,611.60
09 Dec 2007SYABASSupply, installation and commissioning of a 1,500 mm nominal diameter mild steel pipeline and related works from Jalan Air Hitam, Sepang, to the Bangi Golf Resort reservoir.RM28,963,100.60
16 Jul 2008Ministry of Education MalaysiaConstruction of Sekolah Kebangsaan Tun Teja, including 24 classrooms and associated facilities in Mukim Rawang, Gombak, Selangor.RM17,100,000.00
14 Mar 2008JKR MalaysiaConstruction of an additional building for the National Library of Malaysia, Kuala Lumpur.RM36,750,000.00
11 Jan 2011JKR Federal TerritoryUpgrading facilities at Stadium Jalan Raja Muda Abdul Aziz, Lot 5, Section 42, Kuala Lumpur.RM12,295,000.00
24 Feb 2011Pembinaan BLT Sdn. Bhd.Construction and completion of an additional building for the Royal Malaysia Police College at Kuala Kubu Bharu, Hulu Selangor.RM63,507,000.00
22 Jan 2013Ministry of Housing and Local GovernmentRehabilitation of abandoned private housing projects in Peninsular Malaysia, including Taman Seri Marina and Taman Simpang Jaya, Alor Setar, Kedah.RM3,842,000.00
02 Nov 2013Prime Minister's DepartmentDesign-and-build National Permata Autism Centre in Sentul, Kuala Lumpur, including intervention, administration and therapy blocks, family facilities, canteen, surau, swimming pool and playground.RM25,819,240.86
QSE/26JKR MalaysiaRepair and upgrading of dilapidated schools using Industrialised Building System (IBS), Phase 1, 2018, Package 1 for Perak (retender).RM4,558,000.00
QSE/19JKR Kuala LumpurCompletion of remaining works for the additional building at Johor Contingent Police Headquarters (IPK).RM72,800,000.00
QSE/25Maahad TahfizConstruction of the Maahad Tahfiz complex at Lot PT 2034, Mukim Jeram, Kuala Selangor, including the Felda Bukit Cerakah area, Bandar Puncak Alam.RM6,890,000.00
QSE/23JKR Kuala LumpurCivil Defence Training Centre, Kluang, Johor, Phase 2.RM46,481,000.00
QSE/24JKR MelakaConstruction of an academic building at the Armed Forces Health Training Institute (INSAN), Terendak Camp, Melaka.RM25,440,000.00
QSE/27Pengurusan Air Selangor BerhadReplacement of a 1,400 mm nominal diameter mild steel water pipeline from Kolam Air Ampang to the existing system, including civil and associated works in Hulu Langat, Selangor and the Federal Territory.RM24,900,000.00

Cumulative figure stated in the CVRM421,023,081.25

Subcontracted works

Projects as subcontractor

4 projects
Award dateClientProjectContract value
02 Jan 1999Ang Yoke Lian Construction Sdn. Bhd.Water supply mains for development at Lots 1971 and 1762, Ara Damansara, Sections PJU1 and PJU2, Petaling Jaya, Selangor.RM6,105,233.00
24 Jun 2000Ang Yoke Lian Construction Sdn. Bhd.Water reticulation for residential and commercial development in Mukim Petaling, Selangor, for Pelangi Homes.RM3,465,423.71
27 Jan 2005JKR SelangorConstruction and completion of Masjid Country Homes at Lot 9555, Bandar Kundang, Mukim Rawang, Gombak, Selangor.RM5,200,000.00
26 Apr 2006Talian Bena Sdn. Bhd.Construction of a 350,000-gallon water tank, water pipeline installation and related works at Bandar Sultan Sulaiman, Port Klang, Selangor, for PKNS.RM3,255,000.00

The CV shows RM146,785,840.39 as a cumulative figure after the subcontractor section. This is a running document total and is not identified as the sum of these four subcontract values.

The completed-project cumulative figure is reproduced exactly as stated in the CV. Because the document continues with a subcontractor section and its own running cumulative figure, these cumulative figures should not be interpreted as standalone sums for the 23 main contracts or the four subcontracted works.